No Messages
AFCI, Loadcenters, and Bid Manager Configuration
Description
During this 2 hour Virtual Instructor Led Training (VILT), we will: *Have a discussion on Eaton’s Arc Fault Circuit Interrupters (AFCI), *Examine the changes that were made to the 2020 National Electrical Code (NEC), *Discuss the selling characteristics of Eaton’s Plug-on Neutral loadcenters, *Practice loadcenter configuration exercises with Bid Manager